Legislation Details

File #: 26-0237    Version: 1
Type: Consent - Purchase Status: Passed
File created: 4/20/2026 In control: Orange City Council
On agenda: 5/12/2026 Final action: 5/12/2026
Title: Authorization of payment to Big Ben Engineering, Inc. for emergency water main repair and pavement restoration at various locations throughout the City
Attachments: 1. Staff Report, 2. Big Ben Engineering Invoices

TO:                                          Honorable Mayor and Members of the City Council

 

THRU:                     Jarad Hildenbrand, City Manager

                                                                                                          

FROM:                     Christopher Cash, Public Works Director

                                          

                     

1.                     Subject

title

Authorization of payment to Big Ben Engineering, Inc. for emergency water main repair and pavement restoration at various locations throughout the City

body

2.                     Summary

During the labor stoppage in February and March 2026, the Public Works Department utilized the service of Big Ben Engineering, Inc. for emergency water main repairs, service leaks, and asphalt repairs.  The total cost for these repairs is $128,435.81.

3.                     Recommended Action

recommendation

Authorize the payment of $128,435.81 to Big Ben Engineering, Inc. for the repair of water main breaks, service leaks, and pavement restoration at various locations.

end

4.                     Fiscal Impact

The expense for this payment is $128,435.81 and will be funded through the Water Fund (600): 600-5803-56102 - Repair/Maint Services-Facility

5.                     Strategic Plan Goals

Goal 5: Improve Infrastructure, Mobility, and Technology

 

6.                     Discussion and Background

During the labor stoppage in February and March 2026, Big Ben Engineering (BBE), Inc. was engaged to perform emergency repairs for the Water Utility.  BBE has worked on multiple projects for the City in the past and they were available to respond quickly to emergency repair situations.  There were five instances where BBE’s service was needed including a major main line break near the intersection of Main Street and Collins Avenue.  BBE promptly repaired the breaks and restored pavement on a time and material basis. Upon completion of these repairs, time and material tickets and invoices were submitted to the City for review. The total cost for these repairs is $128,435.81.

The repairs to the water mains, service lines, and roadway restoration have been completed satisfactorily. Staff are requesting authorization to make final payment to BBE, Inc. in the amount of $128,435.81.