Title: Award of Contract to Bear Electrical Solutions, LLC for area lighting replacement at Grijalva Park, Bid No. 24-25.06; and finding of CEQA exemption.
Attachments: 1. Staff Report, 2. Contract with Bear Electrical Solution, LLC

TO:                                          Honorable Mayor and Members of the City Council

 

THRU:                     Tom Kisela, City Manager

                                                                                                          

FROM:                     Leslie Hardy, Community Services Director

                                          

                     

1.                     Subject

title

Award of Contract to Bear Electrical Solutions, LLC for area lighting replacement at Grijalva Park, Bid No. 24-25.06; and finding of CEQA exemption.

body

2.                     Summary

Bids for the installation of new poles and fixtures to complete the Area Lighting Replacement at Grijalva Park Capital Improvement Project (20477) were received in September 2024. The City of Orange received six bids in response to the notice inviting bidders. The lowest responsive bidder is Bear Electrical Solutions, LLC of Alviso, California in the amount of $630,000.

3.                     Recommended Action

recommendation

1.                     Approve the contract to Bear Electrical Solutions, LLC in the total amount of $693,000 for the Area Lighting Replacement at Grijalva Park project (20477); and authorize the Mayor and City Clerk to execute on behalf of the City.

2.                     Authorize the appropriation of $58,354 from the Park Acquisition (Infill) Fund (510) unreserved fund balance to:

510.7021.56015.20477                                          CIP - Reno - Area Lighting Replacement.

3.                     Find the project Categorically Exempt from the provisions of the California Environmental Quality Act per State CEQA Guidelines 15302 (Class 2 - Replacement or Reconstruction).

 

end

4.                     Fiscal Impact

The expense for this contract is $693,000 and will be funded through Park Acquisition (Infill) Fund (510) and Reimbursable Capital Projects (550) respectively:

510.7021.56015.20477                     CIP - Reno - Area Lighting Replacement                     $430,314.00

550.7021.56015.20477                     CIP - Renovations                     $262,686.00

                     Total                     $693,000.00

Upon approval of this appropriation, the estimated Park Acquisition (Infill) (510) fund balance at June 30, 2025 will be $4,026,503.

5.                     Strategic Plan Goals

Goal 1: Provide for a safe community

b: Provide and maintain infrastructure necessary to ensure the safety of the public.

Goal 3: Enhance and promote quality of life in the community

a: Renovate, maintain, develop, and/or expand public use places and spaces.

6.                     Discussion and Background

Currently there are a total of 54 light poles providing area and pathway lighting throughout Grijalva Park. The existing light poles are composed of thin gauge steel poles mounted on reinforced concrete foundations at ground level. Many of the existing light poles have failed and have been removed due to corrosion at the base of the poles caused by weather and/or standing irrigation water at the base.

As part of the Area Lighting Replacement at Grijalva Park Capital Improvement Project (20477), the City contracted with Lin Consulting, Inc. (Lin) in 2022 to provide design services and a contract was awarded to Delta Electric, LLC (Delta) in November 2023 in the amount of $621,390 to complete the replacement of the lights.

In May 2024, Delta submitted a written request to the City to release the company of their contract obligations due to outside challenges that impacted their ability  to fulfill the terms outlined in the contract. Delta had yet to complete the work and furnish the labor, materials, tools, and equipment necessary to complete this project. In June 2024, the City entered into an Agreement and Release of Claims with Delta, terminating the contract.

Staff issued a new request for bids to complete this project (RFB No. 24-25.06) in August 2024. The City received 6 bids in September 2024:

1.                     Bear Electrical Solution, LLC, Alviso, CA                                                                                    $630,000.00

2.                     Metrocell Construction, Inc., Ontario, CA                                                                                    $685,000.00

3.                     Oppenheimer National, San Juan Capistrano, CA                                          $698,000.00

4.                     Mel Smith Electric, Inc., Stanton, CA                                                                                    $734,000.00

5.                     Elecnor Belco Electric, Inc., Chino, CA                                                                                    $779,000.00

6.                     RMF Contracting, Inc., Anaheim, CA                                                                                    $779,276.00

 

The lowest responsive and responsible bid is from Bear Electrical Solutions, LLC, (Bear) for $630,000. Staff verified the qualifications of the vendor with references provided for similar projects and received positive responses. Bear’s main office is located in northern California in Alviso, but the servicing office for this project is located in Anaheim.

The starting fund balance for Fiscal Year 2024-25 (FY25) for this project is $634,646, which includes $371,960 in Park Acquisition (Infill) (510) funding and $262,686 in the State’s Per Capita Allocation program funded through Prop 68. Following approval of the proposed contract, the project will require an additional appropriation of $58,354 to complete the project. 

All work will be done with the intent of minimizing disruption to regular park programming or rentals. It may be necessary to restrict access to one or more facilities for specific dates, times, or durations for safety reasons. Signage will be placed at appropriate locations to inform the public of any closures. Work start date and completion will be contingent upon weather conditions.

7.                     ENVIRONMENTAL REVIEW

Categorical Exemption:  The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) per State CEQA Guidelines 15302 (Class 2 - Replacement or Reconstruction) because the project replaces existing light poles with new light poles in the same locations. The new structures will have substantially the same purpose and capacity as the existing light pole. No public review is required.

8.                     ATTACHMENTS

•                     Contract with Bear Electrical Solution, LLC