Title: Award of Contract to LCR Earthwork & Engineering, Corp. for Annual Concrete Replacement at Various Locations, Fiscal Year 2023-2024; Bid No. 23-24.11.
Attachments: 1. Staff Report, 2. Contract with LCR Earthwork & Engineering, Corp., 3. Location Maps, 4. Bid Abstract

TO:                                          Honorable Mayor and Members of the City Council

 

THRU:                     Tom Kisela, City Manager

                                                                                                          

FROM:                     Christopher Cash, Public Works Director

                                          

                     

1.                     Subject

title

Award of Contract to LCR Earthwork & Engineering, Corp. for Annual Concrete Replacement at Various Locations, Fiscal Year 2023-2024; Bid No. 23-24.11.

body

2.                     Summary

Bids for Annual Concrete Replacement at Various Locations (Bid No. 23-24.11, SP-4268), Fiscal Year 2023-2024 were received and opened on November 9, 2023. Eight bidders responded to the notice inviting bids. The apparent low bidder is LCR Earthwork & Engineering, Corp. of Jurupa Valley, California in the amount of $1,322,400.

3.                     Recommended Action

recommendation

Approve contract with LCR Earthwork & Engineering, Corp. in the amount of $1,454,640, representing an original amount of $1,322,400 plus a 10% contingency of $132,240 for Annual Concrete Replacement at Various Locations, Fiscal Year 2023-2024; and authorize the Mayor and City Clerk to execute on behalf of the City.

end

4.                     Fiscal Impact

The total expenditure for this contract is $1,454,640 and will be funded through:

Pavement Management Program (13120), Streetlight Pole Replacement Program (20374), Landscape Maintenance - City Property (00000), and Contractual Services (Labor & Maintenance) (00000).                                          

263.5011.56330.13120                     Measure M2                     $1,038,640

287.5011.56330.13120                     Citywide TSIP                        200,000

500.5011.56100.20374                     Capital Improvements                     66,000

263.5021.51431.00000                     Measure M2                      10,638

263.5021.51700.00000                     Measure M2                       139,362                     

Total:                     $1,454,640

5.                     Strategic Plan Goals

Goal 1: Provide for a safe community

b: Provide and maintain infrastructure necessary to ensure the safety of the public.

Goal 4: Provide outstanding public service

      b: Provide facilities and services to meet customer expectations.

6.                     Discussion and Background

The City Council previously approved advertisement for bids on September 26, 2023. The bid solicitation was advertised on October 5, 2023, for a period of five weeks. The bids were opened on November 9, 2023. Eight bidders responded as follows:

1.                     LCR Earthwork & Engineering, Corp., Jurupa Valley, CA                     $1,322,400

2.                     CJ Concrete Construction Inc., Santa Fe Springs, CA                                          $1,323,600

3.                     Towo Enterprise Inc., Fullerton, CA                                                                                    $1,345,280

4.                     Addison-Miller Inc., Orange, CA                                                                                                         $1,632,045

5.                     Onyx Paving Company, Inc., Anaheim, CA                                                               $1,696,000

6.                     Gentry General Engineering, Inc., Rancho Cucamonga, CA                     $1,852,158

7.                     CT&T Concrete Paving Inc., Pomona, CA                                                               $2,231,300

8.                     Hardy & Harper, Inc., Lake Forest, CA                                                                                    $2,475,000

The low bid is about 8% lower than the Engineer’s Estimate for the project. Staff checked the references and qualifications for LCR Earthwork & Engineering Corp. and found them to be acceptable, with adequate years of experience in complete contracts of a similar nature to this project. Therefore, staff recommends that LCR Earthwork & Engineering Corp. be awarded the contract in the amount of $1,454,640, representing an original amount of $1,322,400 plus a 10% contingency of $132,240 for Annual Concrete Replacement at Various Locations, Fiscal Year 2023-2024.

The project will replace all the needed concrete improvements such as sidewalks, ADA ramps, curbs, and gutters in preparation for the annual pavement rehabilitation work to follow and to address repairs identified by Public Works Field Services Division. Also, this project will include the continued removal and replacement of existing brick sidewalk with concrete sidewalk on the north side of Chapman Avenue from Olive Street to the Plaza Square and the replacement of six existing steel streetlight poles with new concrete streetlight poles at various locations. Construction is expected to begin in January 2024 and is expected to be completed within 90 calendar days.