TO: Honorable Mayor and Members of the City Council
THRU: Tom Kisela, City Manager
FROM: Christopher Cash, Public Works Director
1. SUBJECT
title
Approval of plans and specifications for Asphalt Replacement at Various Locations for Fiscal Year 2025-2026 and authorization to advertise for bids.
body
2. SUMMARY
Plans and specifications have been completed for Asphalt Replacement at Various Locations for Fiscal Year 2025-2026. The project is ready to be advertised for bids. The engineering cost estimate is $725,000.
3. RECOMMENDED ACTION
recommendation
Approve the plans and specifications and authorize advertising for Bid No. 24-25.19, Asphalt Replacement at Various Locations for Fiscal Year 2025-2026.
end
4. FISCAL IMPACT
The expense for this contract is $725,000 and will be funded through Water Fund (600):
600.8041.53830.00000 Annual Asphalt Replacement
5. STRATEGIC PLAN GOALS
Goal 5: Improve Infrastructure, Mobility, and Technology
6. DISCUSSION AND BACKGROUND
Throughout the year, the Water Division conducts routine and emergency repairs of existing infrastructure within the City right-of-way. These repairs are throughout the city and are usually caused by water main breaks and new installations of valves and hydrants. Often, these underground water infrastructure repairs require the removal of existing asphalt concrete on City streets. Once necessary repairs have been made, Public Works Water Division staff will repave the excavated areas with temporary asphalt so that the street can be used without extended delays. Permanent pavement restorations are typically completed by a City authorized contractor.
Over the past several years, approximately 1,500 tons of asphalt concrete has been used per fiscal year. To achieve cost savings with economies of scale, several asphalt concrete repair areas are packaged together to be completed at one time. The cost to repair individual asphalt concrete patches separately is considerably more expen...
Click here for full text