Legislation Details

File #: 26-0551    Version: 1
Type: Consent - Bids Status: Agenda Ready
File created: 9/16/2026 In control: Orange City Council
On agenda: 10/27/2026 Final action:
Title: Approval of plans and specifications for the Emergency Generator and Automatic Transfer Switch at Reservoir 4, and authorization to advertise for bids, and finding of California Environmental Quality Act exemption
Attachments: 1. Staff Report, 2. Location Map
TO: Honorable Mayor and Members of the City Council

THRU: Jarad Hildenbrand, City Manager

FROM: Christopher Cash, Public Works Director


1. SUBJECT
title
Approval of plans and specifications for the Emergency Generator and Automatic Transfer Switch at Reservoir 4, and authorization to advertise for bids, and finding of California Environmental Quality Act exemption
body
2. SUMMARY
Plans and specifications are completed for the Emergency Generator at Reservoir 4 (W-733), and the project is ready to be advertised for bids. The estimated construction cost is $449,850.
3. RECOMMENDED ACTION
recommendation
Approve the plans and specifications and authorize advertising for Bid No. 26-27.10, Emergency Generator and Automatic Transfer Switch at Reservoir 4 (W-733).
Find that the proposed project is categorically exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15301 (Class 1 (c) – Existing Facilities).
end
4. FISCAL IMPACT
None.
5. STRATEGIC PLAN GOALS
Goal 5: Improve Infrastructure, Mobility, and Technology

6. DISCUSSION AND BACKGROUND
The Reservoir 4 Pump Station, located at 5300 Avenida Palmar, is an important facility in the water distribution network. This pump station transfers groundwater production from nearby wells to the storage facilities at higher elevation. To ensure continuous operation during the power outages, the Public Works Department Water Division engaged Gevork Consulting Engineering to design plans and specifications for an emergency backup power system.
The scope of work includes furnishing and installation of one 250 kW, 480V, 3-Phase emergency generator with an Automatic Transfer Switch (ATS). The unit is enclosed in sound-attenuated housing that meets City noise standards. The fuel tank is equipped with a double wall on a concrete pad with a retaining curb to prevent leakage. The fuel tank capacity is designed for 24 hours of continuous operation.
The total estimated constructi...

Click here for full text