Title: A request to construct an interior remodel, second-story mezzanine with an attached terrace, and roof remodel to an existing school located in the Old Towne Historic District located at 515 E. Almond Avenue (DRC No. 25-0138).
Attachments: 1. Staff Report, 2. Attachment 1 Vicinity Map, 3. Attachment 2 DPR Form, 4. Attachment 4 Site Photos, 5. Attachment 3 Project Plans
TO: Chair and Members of the Design Review Committee

THRU: Hayden Beckman, Planning Manager

FROM: Lauren Briggs, Planning Technician


1. SUBJECT
title
A request to construct an interior remodel, second-story mezzanine with an attached terrace, and roof remodel to an existing school located in the Old Towne Historic District located at 515 E. Almond Avenue (DRC No. 25-0138).
end
2. SUMMARY
body
The applicant proposes to construct an interior first floor remodel and a new second story mezzanine with a terrace, and roof remodel for St. John’s Lutheran Church of Orange school. This property is located at 515 E. Almond Avenue and is located in the Old Towne Historic District and St. John’s Lutheran Church Specific Plan and is designated as a contributing property.
3. RECOMMENDED ACTION
recommendation
Approve Design Review No. 25-0138.
end
4. BACKGROUND INFORMATION
Applicant: Robert Kutner
Owner: St. John’s Lutheran Church of Orange
Property Location: 515 E. Almond Avenue
General Plan Designation: Public Facilities Max. 0.5 FAR and Institutions Max. 2.0 FAR (PFI)
Zoning Classification: Public Institution (PI), St. John’s Specific Plan
Existing Development: Religious School constructed in 1929.
Previous DRC Project Review: None.
5. PROJECT DESCRIPTION
The project proposes to construct a 2,848 square-foot second story mezzanine addition and 656 square-foot terrace to existing 10,909 square-foot single story school (Building A) to create a new mezzanine library with a terrace to be used as an outdoor reading room and ancillary site improvements. The first floor will be remodeled to create eight upgraded classrooms, a new 583 square-foot multi-use area, new restrooms, an elevator, and a gallery. The existing roof is proposed to be remodeled which includes the removal of the existing skylights, increasing the overall building height by two feet eight inches to 31 feet in order to construct the second story mezzanine addition, which is to be acces...