TO: Honorable Mayor and Members of the City Council
THRU: Jarad Hildenbrand, City Manager
FROM: Christopher Cash, Public Works Director
1. SUBJECT
title
Authorization of payment to Valverde Construction, Inc. for the repair of the existing water main, storm drain, and pavement restoration at the intersection of Santiago Boulevard and Meats Avenue.
body
2. SUMMARY
The existing 10-inch cast iron pipe main ruptured and caused considerable damage to the street and the storm drain. The break washed away underneath supporting soil and caused a sinkhole near the southwest corner of the intersection. Valverde Construction, Inc. was hired to repair the break and fix the roadway because of their swift response and expertise in this matter. The total cost for these repairs is $283,843.93.
3. RECOMMENDED ACTION
recommendation
1. Authorize the appropriation of $118,000 from the Water (600) unreserved fund balance to:
600-5803-56102 Repair/Maint Services - Facility
2. Authorize the payment to Valverde Construction, Inc. for the repair of the existing water main, storm drain, and pavement restoration at the intersection of Santiago Boulevard and Meats Avenue.
end
4. FISCAL IMPACT
The expense for this payment is $283,843.93 and will be funded though appropriation to Water (600) and from unspent salaries and benefits in Water (600):
600-5803-56102 Repair/Maint Services-Facility
Upon approval of this appropriation, the estimated Water (600) fund balance at June 30, 2026 will be $9,507,893.
5. STRATEGIC PLAN GOALS
Goal 5: Improve Infrastructure, Mobility, and Technology
6. DISCUSSION AND BACKGROUND
On October 4, 2025, the Public Works Department Water Division staff detected that Reservoir 2A slowly and steadily drained unexpectedly. Upon further investigation, staff found an extensive break along the existing 10-inch water main at the intersection of Meats Avenue and Santiago Boulevard. The break was large enough to displace and damage a section of t...
Click here for full text