TO: Honorable Mayor and Members of the City Council
THRU: Tom Kisela, City Manager
FROM: Christopher Cash, Public Works Director
1. SUBJECT
title
Award of Contract to Best Drilling and Pump, Inc. for Well 29 Drilling Project; Bid No. 24-25.13.
body
2. SUMMARY
Five bids for the Well 29 Drilling Project (W-709) were received and opened on March 13, 2025. The apparent low bidder is Best Drilling and Pump, Inc. of Colton, California in the amount of $2,608,116.
3. RECOMMENDED ACTION
recommendation
Approve the contract with Best Drilling and Pump, Inc. in the amount of $2,868,928, representing an original bid amount of $2,608,116, plus a 10% contingency of $260,812, for Well 29 Drilling project; and authorize the Mayor and City Clerk to execute on behalf of the City.
end
4. FISCAL IMPACT
The expense for this contract is $2,868,928 and will be funded through Water Fund (600):
600.8011.56411.20312 Well 29 Construction
5. STRATEGIC PLAN GOALS
Goal 5: Improve Infrastructure, Mobility, and Technology
6. DISCUSSION AND BACKGROUND
Well 29 will be located at the corner of Struck Avenue and Katella Avenue on the same site as the existing Well 8. Well 8 was removed from service in 2018 due to the Per and Polyfluoralkyl substances (PFAS) levels exceeding the regulatory limits and was destroyed in the Fall of 2023. Well 29 will be constructed at this location and is expected to produce approximately 3,000 gallons per minute (gpm) in flow capacity.
The proposed Well 29 project will be constructed in two phases. Phase I will include drilling the well, and Phase II will consist of equipping the well and installing the treatment system.
The Scope of Work for Phase I includes pilot hole drilling, installation of approximately 1,300 feet of 20-inch stainless steel casing and screen, installation of accessory tubing, gravel pack, sanitary seal, hydrogeology testing, well development, and disinfection.
The City Council previously approved advertisement for bids on...