TO: Honorable Mayor and Members of the City Council
THRU: Rick Otto, City Manager
FROM: Christopher Cash, Public Works Director
1. SUBJECT
title
Approval of plans and specifications for the Annual Pipeline Renewal Project and authorization to advertise Bid No. 21-22.08.
body
2. SUMMARY
Construction plans and specifications are completed for the Annual Pipeline Renewal Project. The project is ready to be advertised for bids. The estimated construction cost is $925,830.
3. RECOMMENDED ACTION
recommendation
Approve the plans and specifications, and authorize advertising for bids.
end
4. FISCAL IMPACT
The total expenditure for this project is $925,830 and will be funded in the Pipeline Renewal Projects (18400) through the Water Fund (600).
5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.
Goal 4: Provide outstanding public service
b: Provide facilities and services to meet customer expectations.
6. DISCUSSION AND BACKGROUND
Existing water mains on Santiago Blvd. and Nohl Ranch Rd. are scheduled to be replaced as part of the Annual Pipeline Renewal Project. These water mains were constructed in the late 1960s and have had leaks due to corrosive soils, and are undersized per current standards. The repairs are challenging as they also impact large service areas.
Plans and Specifications have been prepared by water engineering staff to replace these existing water mains. The new equipment will provide more reliable water service and fire protection to the residents in the area.
The scope of work consists of utility potholing, installation of approximately 3,000 feet of new water mains, new water meters, lateral services, fire hydrants, valves, fittings, and other appurtenances in accordance with current water standards.
The engineering estimate for construction costs for this project is $925,830. Construction is scheduled to begin in January of 2022 an...